|
Logistics Transport Movement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expected Mooring Orientation Code |
|
|
|
|
|
Expected mooring orientation, coded |
|
|
|
A code representing the orientation of vessel at the mooring location. |
|
|
|
|
|
Refer to code list Ship side |
|
|
|
|
|
|
|
|
|
Berth or Jetty characteristics |
|
|
|
Features on the berth or jetty the master may need to be aware of, including the position of fixed and mobile obstructions, fenders, bollards and mooring arrangements. |
|
|
|
|
|
|
|
|
Minimum Water Depth Measure |
|
|
|
|
|
|
Minimum depth of water alongside the berth and in approach and departure channels (in meters). |
|
|
|
|
|
|
|
|
Water Density Measure At Berth |
|
|
|
|
|
Water density at the berth |
|
|
|
Water density at the berth. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Berth occupancy start date time |
|
|
|
The estimated date and time when the ship will be moored. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The name of the berth, terminal or station where the ship is located in the port of call. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Requested Towage Tug Service |
|
|
|
|
|
|
|
|
|
|
|
|
|
Required tug type description |
|
|
|
Description of the types of tugs needed. |
|
|
|
|
|
|
|
|
|
|
The number of tugs for the towage movement in port. |
|
|
|
|
|
|
|
|
|
|
The pulling (or towing) power in tons or kilonewtons. |
|
|
|
|
|
|
|
|
Requested Mooring Service |
|
|
|
|
|
|
|
|
|
|
|
|
Gangway Arrangements Description |
|
|
|
|
|
Gangway arrangements description |
|
|
|
Description of the required special arrangement for gangway. |
|
|
|
|
|
|
|
|
|
|
The required number of mooring lines |
|
|
|
|
|
|
|
|
|
Unusual mooring description |
|
|
|
Description of unusual mooring arrangements. |
|
|
|
|
|
|
|
|
Maximum Allowed Speed Measure |
|
|
|
|
|
|
Maximum allowable speed of approach to the jetty in knots |
|
|
|
|
|
|
|
|
Maximum Sailing Draught Measure |
|
|
|
|
|
|
Maximum sailing draught permitted by the competent authority (in meters). |
|
|
|
|
|
|
|
|
Maximum Air Draught Measure |
|
|
|
|
|
|
Allowed maximum vertical distance between the waterline and the highest part of the ship (in meters). |
|
|
|
|
|
|
|
|
Requested Cargo Handling Service |
|
|
|
|
|
|
|
|
|
|
|
|
Handling Equipment Characteristics Text |
|
|
|
|
|
Loading or unloading equipment characteristics |
|
|
|
Characteristics of loading or unloading equipment including the terminal's nominal loading or unloading rate and the number of loading or unloading heads to be used, as well as the estimated time required to complete each pour or — in the case of unloading — the estimated time required for each stage of the discharge. |
|
|
|
|
|
|
|
|
|
|
The loading sequence for different parcels of cargo, and any other restrictions if it is not possible to take the cargo in any order or any hold to suit the ship. |
|
|
|
|
|
|
|
|
Cargo Properties Characteristics Text |
|
|
|
|
|
|
Any properties of the cargo to be loaded which may present a hazard when placed in contact with cargo or residues on board. |
|
|
|
|
|
|
|
|
Advance Instructions Remark |
|
|
|
|
|
|
Advance information on the proposed loading or unloading operations or changes to existing plans for loading or unloading. |
|
|
|
|
|
|
|
|
|
|
If the terminal's loading or unloading equipment is fixed, or has any limits to its movement. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Estimated Occurrence Period |
|
|
|
|
|
|
|
|
|
|
|
|
|
Operations expected start date time |
|
|
|
The date and time at which the vessel is expected to start operations at the berth. |
|
|
|
|
|
|
|
|
|
Operations expected end date time |
|
|
|
The date and time at which the vessel is expected to finish operations at the berth. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballasting or de-ballasting restrictions |
|
|
|
Description of any restrictions on ballasting or de-ballasting. |
|
|
|
|
|
|
|
|
Ship To Shore Applicable Note |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ship requested information |
|
|
|
Any other information related to the ship requested by the terminal |
|
|
|
|
|
|