|
|
|
|
|
|
|
|
|
|
|
|
Statement of any other information relevant to the ship arrival, stay or departure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Textual description of the attached document. |
|
|
|
|
|
|
|
|
|
|
A code indicating the type of the attached document. |
|
|
|
|
|
Refer to code list Attachment type |
|
|
|
|
|
|
|
Logistics Transport Movement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The length of the cargo area from the forward coaming of the forward-most hatch to the after coaming of the aft-most hatch into which cargo is to be loaded or from which cargo is to be unloaded |
|
|
|
|
|
|
|
|
Construction Characteristic |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cargo handling gear details |
|
|
|
Details and capacities of the ship's cargo-handling gear, if any. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The number of mooring lines. |
|
|
|
|
|
|
|
|
|
|
The type of mooring lines. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Terminal requested information |
|
|
|
Any other information related to the ship requested by the terminal. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expected activity description |
|
|
|
The description of the activity that is expected to take place at the ship. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expected activity start time |
|
|
|
The start date and time of the expected activity. |
|
|
|
|
|
|
|
|
|
Expected activity end time |
|
|
|
The end date and time of the expected activity. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water Line To First Cargo Hatch Distance |
|
|
|
|
|
Water line to cargo hatch distance |
|
|
|
The distance from the waterline to the first hatch to be loaded or unloaded in meters. |
|
|
|
|
|
|
|
|
Ship Side To Cargo Hatch Distance |
|
|
|
|
|
Ship side to hatch distance |
|
|
|
The distance from the ship’s side to the hatch opening in meters. |
|
|
|
|
|
|
|
|
Ship Accommodation Ladder Location Text |
|
|
|
|
|
Ship accommodation ladder location |
|
|
|
The location of ship’s accommodation ladder. |
|
|
|
|
|
|
|
|
Ship To Shore Applicable Note |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Specific requests, such as for trimming or continuous measurement of the water content of the cargo. |
|
|
|
|
|
|
|
|
Related Transport Service |
|
|
|
|
|
|
|
|
|
|
|
|
Actual Performance Period |
|
|
|
|
|
|
|
|
|
|
|
|
|
Expected duration of ballast operations |
|
|
|
The estimated time needed for ballasting or de-ballasting operations, expressed in hours and minutes. |
|
|
|
|
|
|