Network of Stand-by Oil Spill Response Vessels: Drills and Exercises. Annual Reports

(0 votes)
Tags OPR
  • Published
    14.02.2012
  • Updated
    14.02.2012

Download this Report

Network of Response Vessels: Quick facts

Number of vessels which can be mobilised simultaneously: 14

Average storage capacity per vessel for recovered oil: 3.756 m3

Network storage capacity, if 14 vessels are mobilised >52.577 m3

Number of related equipment stockpiles: 12

Mobilisation time (vessel ready to sail to site) after signature of Incident Response Contract: 24 hours

Mobilisation procedure:

-Member States request assistance via the MIC

-Member States have operational control of the vessel during the incident

Number of regional or national at-sea exercises in which EMSA vessels were involved (2011): 11