Contractors Info Sheets

Item title Files Published
Aegean Bunkers at Sea pdf aegean infosheet 23.11.2011
Arctia Icebreaking pdf arctia infosheet 23.11.2011
BM Gust pdf BM Gust_infosheet 17.04.2012
DC Industrial pdf dci infosheet 23.11.2011
Environmental Protection Engineering pdf epe infosheet 23.11.2011
Falzon Group Holdings pdf falzon infosheet 23.11.2011
Grup Servicii Petroliere pdf gsp infosheet 23.11.2011
James Fisher Everard Ltd. pdf jfe infosheet 23.11.2011
Lamor / Mureloil pdf lamor-atlantic infosheet 23.11.2011
Mureloil pdf mureloil infosheet 23.11.2011
Naviera Altube pdf Naviera Altube_infosheet 17.04.2012
OW Bunker pdf owbunker infosheet 23.11.2011
Petronav Ship Management pdf petronav infosheet 23.11.2011
Remolcanosa pdf remolcanosa infosheet 23.11.2011
Tankship Management pdf tankship-valletta infosheet
pdf tanskship-laspezia infosheet
23.11.2011

Network of Response Vessels: Quick facts

Number of vessels which can be mobilised simultaneously: 14

Average storage capacity per vessel for recovered oil: 3.756 m3

Network storage capacity, if 14 vessels are mobilised >52.577 m3

Number of related equipment stockpiles: 12

Mobilisation time (vessel ready to sail to site) after signature of Incident Response Contract: 24 hours

Mobilisation procedure:

-Member States request assistance via the MIC

-Member States have operational control of the vessel during the incident

Number of regional or national at-sea exercises in which EMSA vessels were involved (2011): 11